Illustrative method / 01

Connecting requirements to evidence.

A structured approach to requirements, verification, validation and risk controls — with the reasoning visible at every handoff.

01 / Context & challenge

Can each requirement be followed to an appropriate, reviewed result?

In regulated development, a conclusion needs more than a completed document. The relationship between the intended purpose, the chosen approach and the evidence must be understandable.

Contribution of this methodMake the decision basis visible, the evidence connected and the remaining uncertainty explicit.

02 / Structured approach

From question to reviewable evidence.

  1. 01

    Define the requirement

    Clarify intended use, acceptance criteria and the basis for the requirement.

  2. 02

    Connect the evidence

    Link requirements, risk controls, protocols and reports without hiding unresolved gaps.

  3. 03

    Review the chain

    Check coverage, revisions, deviations and the rationale for any remaining limitations.

03 / Evidence architecture

What a reviewer should be able to follow.

A conceptual evidence map — not a completed or approved product record.

Illustrative evidence map
Evidence elementReview focus
RequirementDefined intent & measurable acceptance
Risk controlLinked control & verification rationale
Protocol / reportApproved method, result & review status
Illustrative evidence chainDesign Controls / V&V
  1. 01Requirement

    Define what must be demonstrated.

  2. 02Risk control

    Connect the applicable risk control.

  3. 03Test evidence

    Make the supporting result reviewable.

Verification
Evidence against specified requirements.
Validation
Evidence for user needs and intended use.

Conceptual linkage only. Not every requirement derives from risk. No real device data or employer documents are shown.

04 / Boundaries & professional judgment

The limits are part of the method.

A traceability matrix makes relationships visible. It does not, by itself, demonstrate that a device is safe or compliant. Product-specific evidence and qualified review remain essential.

No actual employer contribution, release decision, product performance or measurable outcome is claimed by this example.

Author: Ilker Kilic. Context references: ISO 13485:2016 · FDA QMSR · ISO 14971:2019.

Related educational resources

Professional conversations

Good work starts with a thoughtful conversation.

For professional opportunities, quality engineering perspectives and relevant collaboration.

Get in touch